Rockhammer RH-200

Rockhammer RH-200 clears bridging, sticking and blockages in steel bunkers, silos and chutes: up to 280 J, 7 impacts per second, welded on where it matters.

Where it is used

Large steel bunkers, silos, transfer chutes and conveyor troughs with heavy bulk cargo: ore, coal, concentrates.

Technical data

ParameterValue
Impact energyup to 280 J
Working pressure7 bar
Air consumption (per unit)2.5 m³/min
Impact rate7 impacts per second
Power supply230 V
Power consumptionup to 160 W
Mass70 kg
Impact pointBunker / silo / chute wall
Suitable structuresSteel bunkers, silos, transfer chutes and conveyor troughs (not concrete silos)
InstallationWelded to the structure at critical points
Control32 preset programs; blockage sensor input; up to 2 units per control box
Units per control boxUp to 2
Working temperatureStandard −30…+40 °C; low-temperature version down to −40 °C (special oil, dried air)
Warranty12 months
Commercial statusSeries production

Honest limitations

The RH-200 mounts on steel structures only — not on concrete silos. Because of its power we always assess the structure’s strength and wall thickness before installation.

Request a quote

Tell us your material, wagon or hopper type and the problem — an engineer replies within 2 working days.

Have a photo of your wagon or hopper, or a drawing? After sending, just reply to our confirmation email with the files attached — it helps us quote accurately, faster.